Structural work for the main buildings at the new campus is entering its final phase as steel support, wood form work and steel tie work is being installed for the roof’s beams for the southeast and northeast wing. Steel form work has also continued for the lift shaft in the northeast wing. Meanwhile, steel form work was removed for the third floor beams and slabs after it was completed and given time to set. In the northwest wing, steel tie work and form work for the third floors columns was carried out while the same is in progress for the columns at the Gym Room in the southwest wing.
Day 268: Structural Work for Roof Beams Begins