After a short break during the Songkran holidays, the masonry work at the new campus has resumed. The masonry work is now being carried out on all three floors of the buildings, including the classrooms, bathrooms, parent room, infirmary room, music room and science lab. A large crane was brought to the site to aid the workers in moving the light-weight concrete blocks to the various floors. Piping work for the bathrooms in the northwest wing has also begun.
Day 396: Masonry Work in Classrooms