The front of school car park is now almost complete! The cement flooring is finished and the shade awning for the school bus drop off point is installed. The ramps for the car park entrance and exit to the street level have also been completed and now what remains is only the installation of the car park gates. The multipurpose flooring for the gym room has been measured, rolled out and laid on the floor of the gym room giving the area a beautiful feel! Next, the flooring will need to be permanently fixed to the gym floor. The protective metal louvre for the swimming pool area is complete along with the shower area and sand wash flooring. New trees have been brought to the campus and planted in the L-shaped playground giving the area additional shade and a green, natural look. Final architectural finishes are underway including the assembling of cupboards in different pantry areas and the installation of air-conditioners in the classrooms.
Day 603: Front Car Park Almost Complete