Day 124: Columns Taking Shape

Concrete columns have quickly sprung up around the construction site in preparation for building the second floor of the school. Steel form work with props were carefully prepared to ensure the columns are vertical and do not move during the casting of concrete. The columns were then provided temporary protection and wrapped with polythene so that moisture loss is minimized and the concrete becomes fully cured.