Day 568: Work in Car Park Begins

Work has begun in the car park at the front entrance of the new campus. Steel support structures have been installed for the school bus boarding zone. A canopy shade will soon be assembled and the car park floor will receive cement pouring. After tiling was completed in the swimming pool, the fence has been erected around the perimeter of the pool area. Bathrooms have received final touches including the placement of mirrors and safety grab bars for the handicapped bathrooms. The air-conditioners have been installed in the large gym room and what remains is the multi-purpose flooring. Hardwood handrails have been placed in several areas of the school including the second floor verandah overlooking the amphitheatre and the steel bridge. Work has now also begun in the large playground which includes the construction of the woodworking shed and the work shed.